This is our long overdue
blog that we started working on in 2017. Our New Year’s resolution for 2018 was
to complete it this year.
Laura purchased her first house in Etobicoke (December 2015) from the original owner who had lived there for 60 years (but had not done much to the house). We knew that there was work to be done. We would have to clean it up before moving in (painting, cleaning and removing old carpets).
The Elliott Renovation
Team was ready to tackle the project.
Once we started removing the
carpets we realized this renovation was going to be a bigger job. The floors were in “rough” shape (worn & stained),
the house was painted in high gloss oil paint, the kitchen required an
overhaul, the bathrooms needed to be gutted, wiring need to be upgraded (all
outlets/switches needed to be rewired and grounded) and some plumbing had to
be done.
Before we knew it, every
room was under renovation except the family room downstairs (we decided to save it for a later project).
The Entry
·
Extended the closet
wall to the ceiling
·
Tiled the foyer
·
Replaced the stained
glass inserts in the door
·
Painted the door
· Added new trim
·
“Updated” and painted
the railing
·
Stripped carpeting
& scraped off the under-padding that
was “fused” to the floor
·
Sanded, sanded and
sanded
·
Filled grooves with
filler and then sanded some more!
·
All base boards and
door trim had to be replaced
Painting
· It took 3 coats of primer and 2 coats of paint to cover the dark oil
based paint
·
All ceilings were
painted
·
Stripped all window
sills and repainted
·
Drywalled over the
swirled ceiling
·
Extended the closet
wall to the ceiling
·
Enlarged and moved
the kitchen doorway
Kitchen
·
Removed the huge
light box and bulkhead from ceiling
·
Removed 5 layers of
flooring
·
Tiled floor and backsplash
·
Primed and painted
the cabinets
·
Changed the
configuration of the cabinets & fridge
·
Removed bulkhead
above bathtub and all drywall
·
Updated plumbing
·
Installed new
bathtub, toilet and sink
·
Drywalled and painted
·
Reinforced stairs to
stop squeaking
·
Removed carpeting and
under-padding (fused to the stairs)
·
Stripped the paint,
sanded, stained and urethaned the steps
·
Removed all drywall
·
Relocated plumbing
stack
·
Installed shower
stall and new fixtures
·
Removed old wooden/chain-link
fence
·
Dug and dug and dug 27
holes for 6x6 posts during the hottest days of August
Laura moved in after 8 months of renovation.