Wednesday, January 10, 2018

This is our long overdue blog that we started working on in 2017. Our New Year’s resolution for 2018 was to complete it this year.

Laura purchased her first house in Etobicoke (December 2015) from the original owner who had lived there for 60 years (but had not done much to the house). We knew that there was work to be done. We would have to clean it up before moving in (painting, cleaning and removing old carpets). 





The Elliott Renovation Team was ready to tackle the project.



Once we started removing the carpets we realized this renovation was going to be a bigger job. The floors were in “rough” shape (worn & stained), the house was painted in high gloss oil paint, the kitchen required an overhaul, the bathrooms needed to be gutted, wiring need to be upgraded (all outlets/switches needed to be rewired and grounded) and some plumbing had to be done.
Before we knew it, every room was under renovation except the family room downstairs (we decided to save it for a later project).



The Entry


·       Extended the closet wall to the ceiling
·       Tiled the foyer
·       Replaced the stained glass inserts in the door
·       Painted the door
·       Added new trim
·       “Updated” and painted the railing 




































Hardwood Floors
·       Stripped carpeting & scraped off the under-padding that was  “fused” to the floor
·       Sanded, sanded and sanded
·       Filled grooves with filler and then sanded some more!
·       Stained and urethaned






































Rooms
·       All base boards and door trim had to be replaced
·       Installed new closet doors in bedrooms










Painting
·   It took 3 coats of primer and 2 coats of paint to cover the dark oil based paint
·       All ceilings were painted
·       Stripped all window sills and repainted
·       All doors were stripped and repainted






















The Living/Dining Room
·       Drywalled over the swirled ceiling
·       Extended the closet wall to the ceiling
·       Enlarged and moved the kitchen doorway
·       Refinished floors and painted













Kitchen
·       Removed the huge light box and bulkhead from ceiling
·       Removed 5 layers of flooring
·       Tiled floor and backsplash
·       Primed and painted the cabinets
·       Changed the configuration of the cabinets & fridge
·       Installed new counter tops and fixtures













































Main Floor Bathroom
·       Removed bulkhead above bathtub and all drywall
·       Updated plumbing
·       Installed new bathtub, toilet and sink
·       Drywalled and painted
·       Tiled the floor and shower enclosure


























Stairs to Basement
·       Reinforced stairs to stop squeaking
·       Removed carpeting and under-padding (fused to the stairs)
·       Stripped the paint, sanded, stained and urethaned the steps
·       Installed new hand railing




























Downstairs Bathroom
·       Removed all drywall
·       Relocated plumbing stack
·       Installed shower stall and new fixtures
·       Tiled floor and shower stall
















Fence
·       Removed old wooden/chain-link fence
·       Dug and dug and dug 27 holes for 6x6 posts during the hottest days of August
·       Attached frames and screwed 400 - 1x6 fence boards with 2400 screws





















Laura moved in after 8 months of renovation. 

 She loves her new home!!